Electrical & Lighting
TDSB faces $3.4-billion renewal needs backlog
The Toronto District School Board (TDSB) has offered a window into its renewal needs backlog by releasing facilities data for each of its school buildings.
The case for load testing standby generators
Period load testing may be costly, but leaving a facility in the dark is costlier. An expert explains how to fix generator problems before outages occur.